Quick summary

  • Utilities

    Water

  • Km From Industrial Track

    2 Km And More

  • Km From Highway

    From 15 To 24.9 Km

  • Zone Size

    Less Than 1 Ha

  • Zone Type

    Mixed

logo_poslovne_cone

Stopno

Zone nameStopno
Zone size in ha0,5
Land occupancy in %50
Possibility of zone expansion5000
Possibility of buying landPossible to buy or rent
Possibility to purchasing premisesUnknown
Option to buy or rentUnknown
Telephone connectionYES (Copper wiring)
Gas connectionNo
Hot water connectionNo
Water connectionYes
Sewage managementNo
Tehnical waterNo
Industrial heatingNo
ElectricityUnknown
Zone distance from the motorway / expressway [km]14
Distance from container terminal of Port Koper245
Distance to container terminal – loading station Maribor [km]22
Distance to container terminal – loading station Celje [km]73
Zone intrusion into a low-flood risk areaNo
Zone intrusion into a high-flood risk areaNo
Zone intrusion into a high-risk areaNo
Encroachment on narrow water protection areasNo
Encroachment on wider water protection areasNo
Encroachment on wider protected areasNo
Encroachment on narrow protected areasNo
Encroachment on sites and sites of natural valuesNo
Encroachment on NATURA 2000 sitesYes
Encroachment on ecologically important areasYes
Encroachment on forest reserve areasNo
Encroachment on protected forest areasNo
Encroachment on sites of cultural heritageYes
Encroachment on terrain slopes1,39

Location

Contact ZRS Bistra Ptuj