Quick summary
Utilities
Water
Km From Industrial Track
2 Km And More
Km From Highway
From 5 To 14.9 Km
Zone Size
From 1 To 4.9 Ha
Zone Type
Mixed

Pečke
Zone name | Pečke |
Zone size in ha | 0,7 |
Land occupancy in % | 0 |
Possibility of zone expansion | No |
Possibility of buying land | Possible to buy |
Possibility to purchasing premises | Unknown |
Option to buy or rent | Unknown |
Telephone connection | YES (Copper wiring) |
Gas connection | No |
Hot water connection | No |
Water connection | Yes |
Sewage management | No |
Tehnical water | No |
Industrial heating | No |
Electricity | No |
Zone distance from the motorway / expressway [km] | 13 |
Distance from container terminal of Port Koper | 245 |
Distance to container terminal – loading station Maribor [km] | 22 |
Distance to container terminal – loading station Celje [km] | 73 |
Zone intrusion into a low-flood risk area | No |
Zone intrusion into a high-flood risk area | No |
Zone intrusion into a high-risk area | No |
Encroachment on narrow water protection areas | No |
Encroachment on wider water protection areas | No |
Encroachment on wider protected areas | No |
Encroachment on narrow protected areas | No |
Encroachment on sites and sites of natural values | No |
Encroachment on NATURA 2000 sites | Yes |
Encroachment on ecologically important areas | Yes |
Encroachment on forest reserve areas | No |
Encroachment on protected forest areas | No |
Encroachment on sites of cultural heritage | No |
Encroachment on terrain slopes | 5,71 |