Quick summary

  • Utilities

    Water, Sewer, Electricity

  • Km From Industrial Track

    2 Km And More

  • Km From Highway

    From 5 To 14.9 Km

  • Zone Size

    From 1 To 4.9 Ha

  • Zone Type

    Business

logo_poslovne_cone

Obrtno Industrijska Cona Benedikt

Zone nameObrtno Industrijska Cona Benedikt
Zone size in ha1,5
Land occupancy in %50
Possibility of zone expansion25000
Possibility of buying landUnknown
Possibility to purchasing premisesUnknown
Option to buy or rentUnknown
Telephone connectionYes (optical network)
Gas connectionNo
Hot water connectionNo
Water connectionYes
Sewage managementYes
Tehnical waterNo
Industrial heatingNo
ElectricityYes
Zone distance from the motorway / expressway [km]8
Distance from container terminal of Port Koper245
Distance to container terminal – loading station Maribor [km]22
Distance to container terminal – loading station Celje [km]73
Zone intrusion into a low-flood risk areaNo
Zone intrusion into a high-flood risk areaNo
Zone intrusion into a high-risk areaNo
Encroachment on narrow water protection areasNo
Encroachment on wider water protection areasNo
Encroachment on wider protected areasNo
Encroachment on narrow protected areasNo
Encroachment on sites and sites of natural valuesNo
Encroachment on NATURA 2000 sitesNo
Encroachment on ecologically important areasNo
Encroachment on forest reserve areasNo
Encroachment on protected forest areasNo
Encroachment on sites of cultural heritageNo
Encroachment on terrain slopes9,95

Location

Contact ZRS Bistra Ptuj