Quick summary

  • Utilities

    Water, Sewer, Electricity

  • Km From Industrial Track

    2 Km And More

  • Km From Highway

    From 5 To 14.9 Km

  • Zone Size

    15 Ha And More

  • Zone Type

    Manufacturing, Industrial

logo_poslovne_cone

Obrtna cona Novi Jork

Zone nameObrtna Cona Novi Jork
Zone size in ha16,0
Land occupancy in %100
Possibility of zone expansion40000
Possibility of buying landPossible to buy
Possibility to purchasing premisesPossible to buy
Option to buy or rentPossible to buy
Telephone connectionYes (optical network)
Gas connectionNo
Hot water connectionNo
Water connectionYes
Sewage managementYes
Tehnical waterNo
Industrial heatingNo
ElectricityYes
Zone distance from the motorway / expressway [km]9
Distance from container terminal of Port Koper245
Distance to container terminal – loading station Maribor [km]22
Distance to container terminal – loading station Celje [km]73
Zone intrusion into a low-flood risk areaNo
Zone intrusion into a high-flood risk areaNo
Zone intrusion into a high-risk areaNo
Encroachment on narrow water protection areasNo
Encroachment on wider water protection areasNo
Encroachment on wider protected areasNo
Encroachment on narrow protected areasNo
Encroachment on sites and sites of natural valuesNo
Encroachment on NATURA 2000 sitesNo
Encroachment on ecologically important areasNo
Encroachment on forest reserve areasNo
Encroachment on protected forest areasNo
Encroachment on sites of cultural heritageNo
Encroachment on terrain slopes2,26

Location

Contact ZRS Bistra Ptuj